Wednesday, November 21, 2012

PR listing without PO created



T code: ME5A


Click on the Multiple Selection button for Processing Status


Select Exclude Single Value tab



Select B = PO created



Click Save button


Execute to generate the PR listing








Thursday, November 1, 2012

Stock Requirement List - Collective Display



Overview

You want to display the stock/requirements situation for a series of materials in the stock/requirements list.

You can use the collective display of the stock/requirements list to check and process current stock/requirements lists according to various criteria.


SAP menu path:


You can use the transaction code MD07 or the following SAP menu path to generate stock requirements list – collective display.


SAP Menu > Logistics > Production > MRP > Evaluation > Stock Requirements List: Collective Display



Use the transaction code MD07 for stock requirements list – collective display.

Stock requirements list: Initial Screen is displayed.

Enter the plant, MRP controller and then press Enter.

The material list appears.

This includes all the materials that fulfill your selection criteria.


System will list out the list of  stock requirements list





Stock Requirement List

Overview:

Stock requirements list unlike MRP list is a dynamic report giving up-to-date information about new requirements of that material, such as Planned Independent Requirements (PIRs), Issue Stock Transfer order, Sales orders and so on.

A stock requirements list is the most up-to-date report of a given material/ materials.

Whenever there is a receipt or issue added to the material, the same is updated in stock requirements list on a real-time basis.

Different between MRP List
The main difference between the MRP list and the stock/requirements list is that each time the stock/requirements list is called, the system selects the MRP elements and displays the most up-to-date situation.
You thus always see the current availability situation of the material in the stock/requirements list.
Changes that are made after the planning date are displayed directly, so the list is therefore dynamic. 


SAP menu path:
SAP Menu > Logistic > Production > MRP > Evaluation > Stock Requirements List

Or you may use T code MD04 to generate stock requirement list.



Fill in Material Number  and Plant Number for which you want to display stock requirements list



System list out stock requirements list as of real time basis