Thursday, November 1, 2012

Stock Requirement List

Overview:

Stock requirements list unlike MRP list is a dynamic report giving up-to-date information about new requirements of that material, such as Planned Independent Requirements (PIRs), Issue Stock Transfer order, Sales orders and so on.

A stock requirements list is the most up-to-date report of a given material/ materials.

Whenever there is a receipt or issue added to the material, the same is updated in stock requirements list on a real-time basis.

Different between MRP List
The main difference between the MRP list and the stock/requirements list is that each time the stock/requirements list is called, the system selects the MRP elements and displays the most up-to-date situation.
You thus always see the current availability situation of the material in the stock/requirements list.
Changes that are made after the planning date are displayed directly, so the list is therefore dynamic. 


SAP menu path:
SAP Menu > Logistic > Production > MRP > Evaluation > Stock Requirements List

Or you may use T code MD04 to generate stock requirement list.



Fill in Material Number  and Plant Number for which you want to display stock requirements list



System list out stock requirements list as of real time basis